Milestone | Date | Notes |
Mobilize to Site | | Achieved |
Shoring Pile Start | | Achieved |
Erect Tower Crane | | Achieved |
Pour Mat Footing – North | | Achieved |
Pour Level 1 Deck – North | | Achieved |
Curtain Wall Start Level 2 | | Achieved |
Elevator Start | | Achieved |
Start Finishes Level 2 | | Achieved |
Concrete Structure Topout Level R4 | | Achieved |
Building Envelope Start | | Achieved |
Drywall Start | | Achieved |
Vertical Transportation Start | | Achieved |
Above Grade Structure Complete | 05/31/22 | |
Dismantle Tower Crane | 09/27/22 | |
Dismantle Manlift | 09/27/22 | |
Substantial Completion | 04/06/23 | |